Link Copied
$1,077,000

Added 1 month ago

2080 Solari Dr, Reno, NV

House

For Sale

Listed price in listed location currency (USD).
$1,077,000

Added 1 month ago

432615 sqft2
  • Key Facts
  • Description
  • Map

Key Facts

Type Single Family Residence
Levels Residential
Size 2615 sqft
Garage Yes
Taxes $2,841
Days Active 40
Lot Size 
Approx. Age 1965
Avg. Price Per Sqft $411
MLS® Number 250051717

Property Address: 2080 Solari Dr, Reno, Nevada

Average square foot calculated using Size range provided by listing agent.

Description

Mid-Century Charmer with Skyline Views + Resort-Style Backyard! Welcome to 2080 Solari Drive—a beautifully reimagined 4-bedroom, 2.5-bath single-story home in one of Reno's most sought-after neighborhoods. At 2, 615 sq ft, this mid century modern stunner offers privacy, charm, and incredible indoor-outdoor living. Originally built in 1965 and extensively renovated between 2014 and 2021, the home was taken down to the studs in the kitchen and bathrooms, with thoughtful updates throughout. The kitchen features granite countertops, custom cabinetry, dual ovens, a built-in microwave, and a gas cooktop added in 2020. Bathrooms were completely redone with travertine tile, new flooring, and a spa-like primary suite with jetted tub and dual vanities. Engineered hardwood floors span the main living spaces, while the family room and bedrooms are carpeted for added comfort. The expansive family room includes a gas-burning convection fireplace installed in 2016, and a smart home panel adds modern convenience. A new roof, furnace, sump pump, and AC system have all been installed in recent years, alongside an upgraded water heater with a recirculating pump. The home's long, low lines are classic mid century, anchored by a private courtyard with turf lawn and a gated entrance. The original pool was resurfaced by Terra Firma in 2015 and includes a solar heating system, automatic chlorination, and "cool crete" pool decking that stays walkable even on hot summer days. An above-ground spa overlooks expansive views of the city skyline and eastern mountain range. A wood deck, custom retaining wall, paver patio, and detached two-car garage with storage and workbench complete the outdoor space, along with a storage shed and pool cabana that both convey with the home. Don't miss the rare opportunity to own a turn-key midcentury classic in Old Southwest—designed for quiet living, effortless entertaining, and timeless style.
MLS® Number250051717
Laundry LevelLaundry Area, Laundry Room, Shelves, Washer Hookup
Central VacNo
FireplaceNo
Acreage0.34
Exterior
GarageYes
Approx. Age1965
Basement
DrivewayAdditional Parking, Garage
Garage Spaces
HeatFireplace(s), Forced Air, Natural Gas
A/CCentral Air, Refrigerated
Heating Fuel

Extras

2080 Solari Dr, Reno, NV

Similar Listings

Like what you see?

Complete the form and we'll be in touch. No login necessary.

Add a Comment

Get notified of price or status changes by saving this listing