Average square foot calculated using Size range provided by listing agent.
Description
In Osceola 1000 \- prime location for Solar Farm and Data Center. Premium location on I-55 one mile North of I-55 and Keiser with all utilities services available. Utilities on site include 500 Kv powered transmission lines, 10 wells for water source, 10 inch gas line across property, internet infrastructure, which is made up of various types of data cables, including fiber-optic, coaxial, and DSL. The property is considered shovel ready. All current solar tax credits are available through the end of 2025 Proximity to Steel Mills and all other manufacturing infrastructure as well as Elon Musk’s multi billion dollar data center in Memphis Colossus and Google’s 10 billion dollar data center project in West Memphis called Project Pyramid said to be the largest investment ever made in Arkansas Parcels include: 101-032181-000 157-03282-000 102-03241-000Show Description
MLS® Number25035069
Laundry Level
Central VacNo
FireplaceNo
Acreage591.25
Exterior
GarageNo
Approx. Age
Basement
Driveway
Garage Spaces
Heat
A/C
Heating Fuel
Extras
Similar Listings
Get notified of price or status changes by saving this listing