The subject property is improved with a pre-engineered metal building used as a onion processing facility. This building contains a total of 38, 691 +/- sq ft. Within the building there is a cold storage area of 2, 100 sq ft for the storage of vegetables. The building is open on three sides. There are three loading docks available for loading and unloading semi-trucks and trailers. There are offices, breakroom & restrooms within the building. There is no HVAC in the main portion of the building. The second metal building is 3, 900 sq ft. This building was used to hold onions before they were processed. Truck scale estimated 100, 000 pound scale 65 feet in length.