Link Copied
$--,---,---
550
  • Key Facts
  • Description
  • Map

Key Facts

Type Single Family Residence
Levels Residential
Size 5467 sqft
Garage Yes
Taxes 
Days Active 292
Lot Size 
Approx. Age 2007
Avg. Price Per Sqft $301
MLS® Number 4165596

Property Address: 

Average square foot calculated using Size range provided by listing agent.

Description

Spacious, beautiful, & well cared for ranch home nestled in the mature landscape of Providence Plantation includes a fully finished walkout basement with lofty ceilings. Cul-de-sac greets the home's driveway & 1.62 acre lot. Special features include: Monogram kitchen appliances; hardwood floors; solar panels; primary bedroom on main floor w/en suite bathroom & 2 custom walk-in closets; main floor Jack & Jill bedrooms; basement guest bedroom w/en suite bathroom; wood burning fireplace on each level; main level balcony & basement deck overlook the massive & peaceful backyard porch & wooded landscape; media room w/surround sound; sunroom overlooks the backyard porch; plantation shutters; installed surge protector; built in speakers in primary bathroom, dining room, living room, & family room; spacious storage room; smart toilets in all bathrooms; laundry room w/retractable drying rack; & built-in cabinetry in garage & 1 bedroom. Come see this impressive home and make it yours today!Show Description
MLS® Number4165596
Laundry LevelLaundry Room, Main Level
Central VacNo
FireplaceNo
Acreage
Exterior
GarageYes
Approx. Age2007
BasementFinished, Storage Space, Walk-Out Access
DrivewayDriveway, Attached Garage, Garage Faces Front
Garage Spaces
HeatNatural Gas
A/CCentral Air
Heating Fuel

Extras

Similar Listings

Like what you see?

Complete the form and we'll be in touch. No login necessary.

Add a Comment

Get notified of price or status changes by saving this listing